Gabriel Morgan: We all agree now that Adoption is key for Enterprise Architects. And the trick to adoption is resonating with those that make change and influence them to make the change that is best for the enterprise. In a previous blog post, I introduced the Solution Model concept. In this post, I want to talk about the concept of the Traceability Critical Path, which is the portion of the Solution Model necessary to trace from Strategy to Code.